{"id":9128,"date":"2022-08-06T17:33:05","date_gmt":"2022-08-06T08:33:05","guid":{"rendered":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&#038;p=9128"},"modified":"2022-12-28T09:22:55","modified_gmt":"2022-12-28T00:22:55","slug":"meti-published-approved-and-commissioned-pv-capacity-under-the-fit-program-as-of-march-31-2022","status":"publish","type":"blogs","link":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/9128\/","title":{"rendered":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 202"},"content":{"rendered":"<div style=\"background: #f6f6f6;padding: 16px 24px;margin-bottom: 1em\">\n<div class=\"row\">\n<div class=\"large-8 small-12\">\n<h6 style=\"margin-bottom: 10px\">Japan Solar Update:\u00a0 No.13\u00a0 (August 1~5, 2022)\u00a0<\/h6>\n<\/div>\n<h6 class=\"large-4 small-12\"><a href=\"#\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6.png\" alt=\"\" width=\"173\" height=\"106\" class=\"wp-image-8365 alignnone\" \/><\/a><\/h6>\n<\/div>\n<\/div>\n<p>The Ministry of Economy, Trade and Industry (METI) published that as of March 31, 2022, cumulative approved capacity of PV projects under the FIT program was 77,056 MW, or 2,615,961 projects and cumulative commissioned capacity was 60,536 MW or 2,449,200 projects*. Compared to December 31, 2021, approved capacity increased by 705 MW and commissioned capacity increased by 1,193MW, brining commissioning rate (rate of start of operation) by capacity to 79%. Of these, the commissioning rate of \u2265 2 MW PV projects continues to rise, although it remained at 62%.<\/p>\n<p>&nbsp;<\/p>\n<p>For the quarter from January to March 2022, by capacity range, commissioned capacity of \u2265 2 MW (extra- high voltage) PV projects was the largest with 543 MW or 27 PV projects followed by &lt; 10 kW PV projects with 244 MW, or 42,765 PV projects, 10 &#8211; &lt; 50 kW (low voltage) with 172 MW, or 3,929 projects, 1 &#8211; &lt; 2 MW PV projects with 120 MW, or 76 PV projects, 50 &#8211; &lt; 500 MW with 72 MW, or 253 PV projects, and 500 &#8211; &lt; 1 MW PV projects with 43 MW, or 56 PV projects.<\/p>\n<p>Commissioned capacity from April 2021 to March 2022 was 4,584 MW.<\/p>\n<p>\nFor the commissioning rate by capacity range, please see the attached figure.<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10pt\">*Alternating current (AC) basis<\/span><\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_9173\" aria-describedby=\"caption-attachment-9173\" style=\"width: 1382px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6-300x183.png\" alt=\"Commisioning rate\" width=\"1382\" height=\"844\" class=\" wp-image-9173\" srcset=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6-300x183.png 300w, https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6-1024x624.png 1024w, https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6-768x468.png 768w, https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6.png 1060w\" sizes=\"auto, (max-width: 1382px) 100vw, 1382px\" \/><figcaption id=\"caption-attachment-9173\" class=\"wp-caption-text\">Commissioning rate<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n","protected":false},"featured_media":9173,"template":"","blogs_category":[49,46],"class_list":["post-9128","blogs","type-blogs","status-publish","has-post-thumbnail","hentry","blogs_category-pv-market-size-installation-volume","blogs_category-weekly-highlight"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>METI published approved and commissioned PV capacity under the FIT program as of March 31, 202 | RTS Corporation<\/title>\n<meta name=\"description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"METI published approved and commissioned PV capacity under the FIT program as of March 31, 202 | RTS Corporation\" \/>\n<meta property=\"og:description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&amp;p=9128\" \/>\n<meta property=\"og:site_name\" content=\"RTS Corporation\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-28T00:22:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/07\/img-consulting-ex06.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128\",\"name\":\"METI published approved and commissioned PV capacity under the FIT program as of March 31, 202 | RTS Corporation\",\"isPartOf\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#primaryimage\"},\"image\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#primaryimage\"},\"thumbnailUrl\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6.png\",\"datePublished\":\"2022-08-06T08:33:05+00:00\",\"dateModified\":\"2022-12-28T00:22:55+00:00\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\",\"breadcrumb\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#primaryimage\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6.png\",\"contentUrl\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6.png\",\"width\":1060,\"height\":646,\"caption\":\"METI published approved and commisioned PV capacity under FIT as of March 31, 2022\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"HOME\",\"item\":\"https:\/\/rts-pv-wp.grgr.link\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PV Blog\",\"item\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blog\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2022\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#website\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/\",\"name\":\"RTS Corporation\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in\",\"publisher\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#organization\",\"name\":\"RTS Corporation\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"contentUrl\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"width\":610,\"height\":88,\"caption\":\"RTS Corporation\"},\"image\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/rts-corporation\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 202 | RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128","og_locale":"en_US","og_type":"article","og_title":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 202 | RTS Corporation","og_description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","og_url":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128","og_site_name":"RTS Corporation","article_modified_time":"2022-12-28T00:22:55+00:00","og_image":[{"url":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/07\/img-consulting-ex06.jpg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128","url":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128","name":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 202 | RTS Corporation","isPartOf":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#primaryimage"},"image":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#primaryimage"},"thumbnailUrl":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6.png","datePublished":"2022-08-06T08:33:05+00:00","dateModified":"2022-12-28T00:22:55+00:00","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","breadcrumb":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#primaryimage","url":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6.png","contentUrl":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2022\/11\/044bf6ebf0202a594798eda464f1bdc6.png","width":1060,"height":646,"caption":"METI published approved and commisioned PV capacity under FIT as of March 31, 2022"},{"@type":"BreadcrumbList","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&p=9128#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"HOME","item":"https:\/\/rts-pv-wp.grgr.link\/en\/"},{"@type":"ListItem","position":2,"name":"PV Blog","item":"https:\/\/rts-pv-wp.grgr.link\/en\/blog\/"},{"@type":"ListItem","position":3,"name":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2022"}]},{"@type":"WebSite","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#website","url":"https:\/\/rts-pv-wp.grgr.link\/en\/","name":"RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in","publisher":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rts-pv-wp.grgr.link\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#organization","name":"RTS Corporation","url":"https:\/\/rts-pv-wp.grgr.link\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/","url":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","contentUrl":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","width":610,"height":88,"caption":"RTS Corporation"},"image":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rts-corporation\/"]}]}},"_links":{"self":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs\/9128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs"}],"about":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/types\/blogs"}],"version-history":[{"count":16,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs\/9128\/revisions"}],"predecessor-version":[{"id":9666,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs\/9128\/revisions\/9666"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/media\/9173"}],"wp:attachment":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/media?parent=9128"}],"wp:term":[{"taxonomy":"blogs_category","embeddable":true,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs_category?post=9128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}