{"id":13466,"date":"2025-01-23T09:00:43","date_gmt":"2025-01-23T00:00:43","guid":{"rendered":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&#038;p=13466"},"modified":"2025-01-23T09:16:59","modified_gmt":"2025-01-23T00:16:59","slug":"japan-advances-pv-recycling-costs-and-abandoned-module-solutions-part-ii","status":"publish","type":"blogs","link":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/","title":{"rendered":"Japan Advances PV Recycling Costs and Abandoned Module Solutions part II"},"content":{"rendered":"<div style=\"background: #f6f6f6;padding: 16px 24px;margin-bottom: 1em\">\n<div class=\"row\">\n<div class=\"large-8 small-12\">\n<h6 style=\"margin-bottom: 10px\">Japan Solar Update: No.132 (Jan 20 ~ 24, 2025)\u00a0<\/h6>\n<\/div>\n<h6 class=\"large-4 small-12\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/12\/Panel-Recycling-Cost-saving-obligation.jpg\" alt=\"Recycle\" width=\"155\" height=\"137\" class=\"alignnone wp-image-12546\" \/><\/h6>\n<\/div>\n<\/div>\n<p>The Agency for Natural Resources and Energy (ANRE) under the Ministry of Economy, Trade and Industry (METI) and the Ministry of the Environment (MoE) recently held joint meetings of the Working Group for PV Facility Recycling (METI) and the Subcommittee for PV Facility Recycling Scheme (MoE) and discussed the cost burden of recycling, etc.<\/p>\n<p>&nbsp;<\/p>\n<p>In the discussion, based on the principles of \u201cwaste generators\u2019 responsibility\u201d on the business operators and \u201cextended producer responsibility\u201d on the producers, the WG presented a proposal of categorizing the costs on recycling into the cost for demolition, etc. and the cost for recycling, a proposal of limiting the target of mandatory recycling to PV modules, and so on.<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #f5deb3;padding: 10px;border: 2px#3399cc;border-radius: 5px\">\n<p><strong><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\">&lt;Key points&gt;<\/span><\/span><\/span><\/strong><\/p>\n<ul>\n<li>In principle, all PV systems are subject to deposit for dismantling and other expenses, and this will also apply to the PV systems that have already been installed. Residential PV systems are an exception to the deposit obligation<\/li>\n<li>As a general rule, payment of demolition costs is required to be deposited at the start of the project<\/li>\n<li>Directions have also been sorted out on the method of calculating demolition cost, measures against abandoned PV modules, and the overall picture of information management<\/li>\n<li>Since general support has been gained, the Working Group (WG) plans to proceed with deliberations toward the compilation of the report at the next meeting<\/li>\n<\/ul>\n<\/div>\n<div><\/div>\n<p>&nbsp;<\/p>\n<div>\n<div style=\"background: #fff0f5;padding: 8px;width: 40%;height: 45px;border-radius: 10px;border: solid  #fff0f5;border-width: thin;float: left\">\n<p style=\"text-align: left\"><strong>How to bear the cost of dismantling, etc.<\/strong><\/p>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div>\n<div style=\"background: #ffffff;padding: 10 px;height: 370px;border-radius: 1px;border: solid #f08080;border-width: thin\">\n<ul>\n<li><span style=\"color: #ff0000\">The owner of the facility<\/span> bears the cost of demolition (agreed at the previous meeting)<\/li>\n<li>In order to ensure the cost of demolition, etc., <span style=\"color: #ff0000\">it is necessary to have a mechanism to make a deposit with a third-party organization<\/span><\/li>\n<li><span style=\"color: #ff0000\">In principle, all PV systems are subject to deposit for the cost of demolition and other expenses<\/span>, and this applies to those that have already been installed<\/li>\n<li><span style=\"color: #ff0000\">As a general rule<\/span>, payment of demolition costs must be deposited before the start of the project<\/li>\n<li><span style=\"color: #ff0000\">Residential PV systems are not subject to the deposit obligation<\/span> because they are unlikely to be left unattended<\/li>\n<li>Facility owners who are expected to surely secure costs are exceptionally <span style=\"color: #ff0000\">allowed for internal reserve of funds<\/span><\/li>\n<li><span style=\"color: #ff0000\">Facility owners that secure the cost of demolition and other expenses based on the Act on Special Measures for Renewable Energy will not be required to make a deposit under the new system<\/span><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<div>\n<div style=\"background: #ffffff;padding: 8px;width: 80%;height: 50px;border-radius: 10px;border: solid  #ffffff;border-width: thin\">\n<p>&nbsp;<\/p>\n<p style=\"text-align: left\"><strong>How to calculate the cost of demolition, etc.<\/strong><\/p>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<div>\n<div style=\"background: #ffffff;padding: 10 px;height: 160px;border-radius: 1px;border: solid #000000;border-width: thin\">\n<ul>\n<li><span style=\"color: #ff0000\"><span style=\"color: #000000\">To calculate<\/span> by multiplying the quantity by a certain unit price <\/span><\/li>\n<li>For the unit of quantity, <span style=\"color: #ff0000\">the output capacity of the power generation facility is used as the unit of calculation<\/span><\/li>\n<li>The level of disposal costs envisaged under the FIT\/FIP programs shall be referred to<\/li>\n<li><span style=\"color: #ff0000\">If there is a shortage of expenses<\/span> in an individual project, <span style=\"color: #ff0000\">the facility owner shall bear the shortfall<\/span><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<div><\/div>\n<div>\n<div style=\"background: #ffffff;padding: 6px;width: 40%;height: 80px;border-radius: 10px;border: solid #ffffff;float: left\">\n<p><strong><span style=\"color: #000000;letter-spacing: 0.05em\">Measures against abandoned PV modules<\/span><\/strong><\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 60%;height: 80px;border-radius: 10px;border: solid #ffffff;float: left\">\n<p>In addition to the existing measures, the following mechanisms will be considered<\/p>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<div>\n<div style=\"background: #ffffff;padding: 10px;height: 230px;border-radius: 1px;border: solid #000000;border-width: thin\">\n<ul>\n<li><span style=\"color: #ff0000\">To establish a mechanism<\/span><span style=\"letter-spacing: 0.05em\"> to surely <\/span><span style=\"color: #ff0000\">ensure that the cost of demolition, etc. and recycling costs are secured<\/span><span style=\"letter-spacing: 0.05em\"> at an early stage, including non-FIT\/non-FIP systems<\/span><\/li>\n<li>To establish a mechanism to <span style=\"color: #ff0000\">share<\/span> <span style=\"color: #ff0000\">information<\/span> on PV systems, as well as information on disposal and recycling,<span style=\"color: #ff0000\"> including non-FIT\/non-FIP systems<\/span><\/li>\n<li>To establish a mechanism that will allow the use of the cost of demolition, etc. and recycling costs secured at that time, in case PV modules are abandoned and a third party other than the facility owner dismantles or removes the abandoned PV modules<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<div>\n<div>\n<div style=\"background: #ffffff;padding: 8px;width: 80%;height: 50px;border-radius: 10px;border: solid  #ffffff;border-width: thin\">\n<p>&nbsp;<\/p>\n<p style=\"text-align: left\"><strong>Overall image of information management<\/strong><\/p>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<div>\n<div style=\"background: #ffffff;padding: 10 px;height: 160px;border-radius: 1px;border: solid #000000;border-width: thin\">\n<ul>\n<li>It is necessary to have a <span style=\"color: #ff0000\">mechanism<\/span> for the relevant players to<span style=\"color: #ff0000\"> register<\/span> the information necessary for the implementation of appropriate disposal and recycling with an organization that aggregates information. The information on costs and goods will be managed in an integrated manner<\/li>\n<li>Integrate information on existing infrastructure as much as possible, and examine it including the information provided by power producers, etc.<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<div>\n<div style=\"background: #ffdab9;border-width: thin;padding: 6px;width: 15%;height: 100px;border-radius: 10px;border: solid #f08080;float: left\">\n<p style=\"text-align: center\"><span style=\"color: #000000\">Chairperson Owada <\/span><\/p>\n<\/div>\n<div style=\"background: #ffffff;padding: 6px;width: 85%;height: 100px;border-radius: 1px;border: solid #f08080;border-width: thin;float: left\">He commented that there is still a lot of discussion to be done in detail, but he believes that <span style=\"color: #ff0000\">the Secretariat proposal has been agreed in principle<\/span>. He asked the Secretariat to proceed with compiling the discussions.<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<div>\n<p>&nbsp;<\/p>\n<p>At the next meeting, it is planned to proceed with deliberations toward the conclusion of this joint meeting<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10pt\">Source: Materials of the 6th Joint Meeting of the Working Group for PV Facility Recycling and the Subcommittee for PV Facility Recycling Scheme (November 21, 2024), compiled by RTS Corporation<\/span><\/p>\n<div style=\"clear: both\"><\/div>\n<p>&nbsp;<\/p>\n<\/div>\n<\/div>\n","protected":false},"featured_media":13604,"template":"","blogs_category":[50],"class_list":["post-13466","blogs","type-blogs","status-publish","has-post-thumbnail","hentry","blogs_category-pv-market-trend"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Japan Advances PV Recycling Costs and Abandoned Module Solutions part II | RTS Corporation<\/title>\n<meta name=\"description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Japan Advances PV Recycling Costs and Abandoned Module Solutions part II | RTS Corporation\" \/>\n<meta property=\"og:description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/\" \/>\n<meta property=\"og:site_name\" content=\"RTS Corporation\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-23T00:16:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/12\/Panel-Recycling-Cost-saving-obligation.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"293\" \/>\n\t<meta property=\"og:image:height\" content=\"259\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/\",\"name\":\"Japan Advances PV Recycling Costs and Abandoned Module Solutions part II | RTS Corporation\",\"isPartOf\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/12\/Panel-Recycling-Cost-saving-obligation.jpg\",\"datePublished\":\"2025-01-23T00:00:43+00:00\",\"dateModified\":\"2025-01-23T00:16:59+00:00\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\",\"breadcrumb\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#primaryimage\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/12\/Panel-Recycling-Cost-saving-obligation.jpg\",\"contentUrl\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/12\/Panel-Recycling-Cost-saving-obligation.jpg\",\"width\":293,\"height\":259,\"caption\":\"Panel Recycling Cost saving obligation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"HOME\",\"item\":\"https:\/\/rts-pv-wp.grgr.link\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PV Blog\",\"item\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blog\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Japan Advances PV Recycling Costs and Abandoned Module Solutions part II\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#website\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/\",\"name\":\"RTS Corporation\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in\",\"publisher\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#organization\",\"name\":\"RTS Corporation\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"contentUrl\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"width\":610,\"height\":88,\"caption\":\"RTS Corporation\"},\"image\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/rts-corporation\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Japan Advances PV Recycling Costs and Abandoned Module Solutions part II | RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/","og_locale":"en_US","og_type":"article","og_title":"Japan Advances PV Recycling Costs and Abandoned Module Solutions part II | RTS Corporation","og_description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","og_url":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/","og_site_name":"RTS Corporation","article_modified_time":"2025-01-23T00:16:59+00:00","og_image":[{"width":293,"height":259,"url":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/12\/Panel-Recycling-Cost-saving-obligation.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/","url":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/","name":"Japan Advances PV Recycling Costs and Abandoned Module Solutions part II | RTS Corporation","isPartOf":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#primaryimage"},"image":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#primaryimage"},"thumbnailUrl":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/12\/Panel-Recycling-Cost-saving-obligation.jpg","datePublished":"2025-01-23T00:00:43+00:00","dateModified":"2025-01-23T00:16:59+00:00","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","breadcrumb":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#primaryimage","url":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/12\/Panel-Recycling-Cost-saving-obligation.jpg","contentUrl":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/12\/Panel-Recycling-Cost-saving-obligation.jpg","width":293,"height":259,"caption":"Panel Recycling Cost saving obligation"},{"@type":"BreadcrumbList","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/13466\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"HOME","item":"https:\/\/rts-pv-wp.grgr.link\/en\/"},{"@type":"ListItem","position":2,"name":"PV Blog","item":"https:\/\/rts-pv-wp.grgr.link\/en\/blog\/"},{"@type":"ListItem","position":3,"name":"Japan Advances PV Recycling Costs and Abandoned Module Solutions part II"}]},{"@type":"WebSite","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#website","url":"https:\/\/rts-pv-wp.grgr.link\/en\/","name":"RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in","publisher":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rts-pv-wp.grgr.link\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#organization","name":"RTS Corporation","url":"https:\/\/rts-pv-wp.grgr.link\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/","url":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","contentUrl":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","width":610,"height":88,"caption":"RTS Corporation"},"image":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rts-corporation\/"]}]}},"_links":{"self":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs\/13466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs"}],"about":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/types\/blogs"}],"version-history":[{"count":64,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs\/13466\/revisions"}],"predecessor-version":[{"id":13623,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs\/13466\/revisions\/13623"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/media\/13604"}],"wp:attachment":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/media?parent=13466"}],"wp:term":[{"taxonomy":"blogs_category","embeddable":true,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs_category?post=13466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}