{"id":12813,"date":"2024-09-19T09:00:39","date_gmt":"2024-09-19T00:00:39","guid":{"rendered":"https:\/\/rts-pv-wp.grgr.link\/en\/?post_type=blogs&#038;p=12813"},"modified":"2024-09-20T14:50:36","modified_gmt":"2024-09-20T05:50:36","slug":"meti-published-approved-and-commissioned-pv-capacity-under-the-fit-program-as-of-march-31-2024","status":"publish","type":"blogs","link":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/","title":{"rendered":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2024"},"content":{"rendered":"<div style=\"background: #f6f6f6;padding: 16px 24px;margin-bottom: 1em\">\n<div class=\"row\">\n<div class=\"large-8 small-12\">\n<h6 style=\"margin-bottom: 10px\">Japan Solar Update: No.114 (Sept 16 ~ 20, 2024)\u00a0<\/h6>\n<\/div>\n<h6 class=\"large-4 small-12\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg\" alt=\"24 Q1 commissioned\" width=\"107\" height=\"150\" class=\"alignnone wp-image-12546\" \/><\/h6>\n<\/div>\n<\/div>\n<p>The Ministry of Economy, Trade and Industry (METI) published approved and commissioned PV capacity under the FIT program as of March 31, 2024. The commissioned capacity from April 2023 to March 2024 was 3,096 MW.<\/p>\n<p>&nbsp;<\/p>\n<div style=\"background: #f5deb3;padding: 10px;border: 2px#3399cc;border-radius: 5px\">\n<p><strong><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\"><span style=\"letter-spacing: 0.05em\">&lt;Key points&gt;<\/span><\/span><\/span><\/strong><\/p>\n<ul>\n<li>The Ministry of Economy, Trade and Industry (METI) published that as of March 31 20224, the cumulative approved capacity was 74.5 GW, up 0.3 GW from the end of December 2023, despite the continued cancellations of certifications under METI&#8217;s approval cancellation system, and the cumulative capacity was 68.2 GW, up 0.7 GW from the end of December 2023.The overall operation rate increased to 92%.<\/li>\n<li>For the quarter from January to March period of 2024, by capacity range, commissioned capacity of less than 10 kW PV projects was the largest with 371MW followed by 2 MW or more projects with 137 MW, 1-2 MW projects with 71MW, and 10-50 kW projects with 46MW<\/li>\n<li>In FY2023, commissioned capacity decreased by 33% y\/y to 3,096 MW (AC), with a significant decrease in large-scale projects<\/li>\n<\/ul>\n<\/div>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10pt\">*Alternating current (AC) basis<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar-300x180.jpg\" alt=\"Commissioned 2024 Mar\" width=\"888\" height=\"533\" class=\"wp-image-12823 aligncenter\" srcset=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar-300x180.jpg 300w, https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg 754w\" sizes=\"auto, (max-width: 888px) 100vw, 888px\" \/><\/p>\n<p style=\"text-align: center\"><span style=\"font-size: 10pt\">Figure 1 Approved and commissioned capacities of PV projects as of March 31, 2024 (by capacity range)<\/span><\/p>\n<p style=\"text-align: center\">\n<p style=\"text-align: center\"><span style=\"font-size: 10pt\">Table 1 Approved and commissioned capacities of PV projects as of March 31, 2024 (by capacity range)<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Approved-and-Commissioned-Mar-2024.jpg\" alt=\"Commissioned 2024 Mar\" width=\"888\" height=\"533\" class=\"wp-image-12823 aligncenter\" \/><\/p>\n<p><span style=\"font-size: 10pt\">Source: Materials from METI, compiled by RTS Corporation<\/span><\/p>\n","protected":false},"featured_media":12823,"template":"","blogs_category":[49],"class_list":["post-12813","blogs","type-blogs","status-publish","has-post-thumbnail","hentry","blogs_category-pv-market-size-installation-volume"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>METI published approved and commissioned PV capacity under the FIT program as of March 31, 2024 | RTS Corporation<\/title>\n<meta name=\"description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2024 | RTS Corporation\" \/>\n<meta property=\"og:description\" content=\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/\" \/>\n<meta property=\"og:site_name\" content=\"RTS Corporation\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-20T05:50:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"754\" \/>\n\t<meta property=\"og:image:height\" content=\"453\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/\",\"name\":\"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2024 | RTS Corporation\",\"isPartOf\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg\",\"datePublished\":\"2024-09-19T00:00:39+00:00\",\"dateModified\":\"2024-09-20T05:50:36+00:00\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.\",\"breadcrumb\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#primaryimage\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg\",\"contentUrl\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg\",\"width\":754,\"height\":453,\"caption\":\"Commissioned 2024 Mar\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"HOME\",\"item\":\"https:\/\/rts-pv-wp.grgr.link\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PV Blog\",\"item\":\"https:\/\/rts-pv-wp.grgr.link\/en\/blog\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2024\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#website\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/\",\"name\":\"RTS Corporation\",\"description\":\"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in\",\"publisher\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/rts-pv-wp.grgr.link\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#organization\",\"name\":\"RTS Corporation\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"contentUrl\":\"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png\",\"width\":610,\"height\":88,\"caption\":\"RTS Corporation\"},\"image\":{\"@id\":\"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/rts-corporation\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2024 | RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/","og_locale":"en_US","og_type":"article","og_title":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2024 | RTS Corporation","og_description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","og_url":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/","og_site_name":"RTS Corporation","article_modified_time":"2024-09-20T05:50:36+00:00","og_image":[{"width":754,"height":453,"url":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/","url":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/","name":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2024 | RTS Corporation","isPartOf":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#primaryimage"},"image":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#primaryimage"},"thumbnailUrl":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg","datePublished":"2024-09-19T00:00:39+00:00","dateModified":"2024-09-20T05:50:36+00:00","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in RTS Corporation is a leading PV industry \/ market consultingcompany and has been supporting the growth of the PV industry for nearly 40 years.We provide an optimal consulting service for each client interested in the PV business.\u3000Weekly PV news is available at RTS PV Blog.","breadcrumb":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#primaryimage","url":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg","contentUrl":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2024\/09\/Commissioned-2024-Mar.jpg","width":754,"height":453,"caption":"Commissioned 2024 Mar"},{"@type":"BreadcrumbList","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/blogs\/12813\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"HOME","item":"https:\/\/rts-pv-wp.grgr.link\/en\/"},{"@type":"ListItem","position":2,"name":"PV Blog","item":"https:\/\/rts-pv-wp.grgr.link\/en\/blog\/"},{"@type":"ListItem","position":3,"name":"METI published approved and commissioned PV capacity under the FIT program as of March 31, 2024"}]},{"@type":"WebSite","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#website","url":"https:\/\/rts-pv-wp.grgr.link\/en\/","name":"RTS Corporation","description":"Based upon over 40 years of our experiences and accumulated knowledge in PV,RTS Corporation has been providing in","publisher":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rts-pv-wp.grgr.link\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#organization","name":"RTS Corporation","url":"https:\/\/rts-pv-wp.grgr.link\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/","url":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","contentUrl":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-content\/uploads\/sites\/3\/2020\/02\/logo-1.png","width":610,"height":88,"caption":"RTS Corporation"},"image":{"@id":"https:\/\/rts-pv-wp.grgr.link\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rts-corporation\/"]}]}},"_links":{"self":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs\/12813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs"}],"about":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/types\/blogs"}],"version-history":[{"count":16,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs\/12813\/revisions"}],"predecessor-version":[{"id":12890,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs\/12813\/revisions\/12890"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/media\/12823"}],"wp:attachment":[{"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/media?parent=12813"}],"wp:term":[{"taxonomy":"blogs_category","embeddable":true,"href":"https:\/\/rts-pv-wp.grgr.link\/en\/wp-json\/wp\/v2\/blogs_category?post=12813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}